500 tons / day packing line (1.8-5L)
Civil production line layout: the third floor, second floor, first floor
Production line equipment consists of:
Third floor: carton opening machine, drop box machine, clip bottle conveyor
Second floor: Gas washing machine, filling and capping machine (attach cap elevator), put pressure ring, cold glue labeling machine, packing machine, screw conveyor and total control cabinet
Equipped with: laser coders, weighing detection machines, large character inkjet printer, transportation equipment
http://www.wzfiller.com/food-p....acking-machine/oil-a